Source: The Japan Times
Date: Monday, May 30, 2011 JST
by: REIJI YOSHIDA
Tepco installs backup unit 15 hours later for halted reactor
The seawater pump in the cooling system for the Fukushima power plant's No. 5 reactor broke down Saturday evening, prompting repair crews to install a backup pump 15 hours later on Sunday afternoon, Tokyo Electric Power Co. said.
...
Read full article here
Showing posts with label breakdown. Show all posts
Showing posts with label breakdown. Show all posts
Sunday, May 29, 2011
5/30/2011 JST | Pump failure nearly brings No. 5 to a boil
Subscribe to:
Posts (Atom)
ShareThis
Radiation News Archive
- ► 2012 (202)


