Source: WNN (World Nuclear News)
Date: 26 May 2011
Computer analysis of reactor damage at Fukushima Daiichi has indicated more serious fuel melt has probably occurred than previously thought at units 2 and 3.
...
Read full article here
Thursday, May 26, 2011
5/26/2011 | Large scale melt predicted at units 2 and 3
Labels:
Fukushima Daiichi,
meltdown,
reactor 2,
reactor 3
5/26/2011 | DIY: Inexpensive USB Gieger Counter Hack To Measure Japan Nuclear Radiation
Source: Alexander Higgins Blog
Date: May 26, 2011 at 2:57 pm
by: Alexander Higgins

Learn how to use an inexpensive Geiger counter to build a Japan nuclear radiation monitor will use the USB port on your computer to monitor radioactivity.
...
Read full article here
Date: May 26, 2011 at 2:57 pm
by: Alexander Higgins
Learn how to use an inexpensive Geiger counter to build a Japan nuclear radiation monitor will use the USB port on your computer to monitor radioactivity.
...
Read full article here
5/26/2011 | Reactor 1 dry well radiation drops from 215 Sv/h to 43.7 Sv/h
Source: http://atmc.jp/plant/rad/?n=1
Date: May 26, 2011 Chart snapshot from 6:00 PM CST
A bit of good news with Fukushima reactor 1, it appears the radiation level has dropped drastically in the dry well from 215 Sv/h down to 43.7 Sv/h:
Date: May 26, 2011 Chart snapshot from 6:00 PM CST
A bit of good news with Fukushima reactor 1, it appears the radiation level has dropped drastically in the dry well from 215 Sv/h down to 43.7 Sv/h:
Click here for live chart
Location: Unit 1 nuclear power plant Hukushima Date: Mar 15, 2011 (Tuesday) to May 26, 2011 (Thursday) Current values: D / W: 43.7 Sv / h , S / C: .958 Sv / h Status Instrument failure
Date D / W S / C 5 / 26 43.7 0.958 5 / 25 215 0.987 5 / 24 192 0.997 5 / 23 201 1.01 5 / 22 196 1.01 5 / 21 36.2 1.02 5 / 20 46.5 1.03 5 / 19 36.3 1.04 5 / 18 45.4 1.04 5 / 17 _ 1.04 5 / 16 _ 1.05 5 / 15 _ 1.06 5 / 14 _ 1.07 5 / 13 _ 1.08 5 / 12 _ 1.09 5 / 11 _ 1.10 5 / 10 _ 1.11 5 / 09 _ 1.13 5 / 08 _ 1.14 5 / 07 _ 1.15 5 / 06 _ 1.17 5 / 05 _ 1.18 5 / 04 _ 1.2 ![]()
Nuclear and Industrial Safety Agency has announced that the plant parameters (reactor state) of the reactor radiation dose to the graph.
Fukushima Daiichi nuclear power plant reactor 1 can be checked on a daily basis - such as water temperature, pressure dose of 5 items.
As soon as the data is published and updated as the chart.
No. 4 in the absence of inspections stopped reactor fuel assemblies for, are excluded from the list.
Meaning of the terms in the graph below.
D / W stands for dry well .... The main thing containment. S / C ... Sapuresshonchenba stands. I pressure suppression chamber.
※ The value of the graph shows the maximum absolute value of the day.
5/26/2011 | Greenpeace slams Japan response to nuclear crisis
Source: Reuters
Date: Thu May 26, 2011 5:14am EDT
by: Nick Macfie
(Reuters) - Environmental group Greenpeace on Thursday slammed Japan's "continued inadequate response" to the nuclear disaster at a power plant after new data showed seaweed radiation levels 50 times higher than official limits.
...
Read full article here
Date: Thu May 26, 2011 5:14am EDT
by: Nick Macfie
(Reuters) - Environmental group Greenpeace on Thursday slammed Japan's "continued inadequate response" to the nuclear disaster at a power plant after new data showed seaweed radiation levels 50 times higher than official limits.
...
Read full article here
5/26/2011 | Japanese from nuke town make brief visit to homes
Source: AP via seattle pi
Date: Updated 04:36 a.m., Thursday, May 26, 2011
by: ERIC TALMADGE, Associated Press
TAMURA, Japan (AP) — Donning white protective suits and masks, neighbors of Japan's radiation-leaking nuclear plant were finally able to return home Thursday more than two months after the crisis began, but were only given two hours to stuff their belongings into garbage bags before leaving again.
...
Read full article here
Date: Updated 04:36 a.m., Thursday, May 26, 2011
by: ERIC TALMADGE, Associated Press
TAMURA, Japan (AP) — Donning white protective suits and masks, neighbors of Japan's radiation-leaking nuclear plant were finally able to return home Thursday more than two months after the crisis began, but were only given two hours to stuff their belongings into garbage bags before leaving again.
...
Read full article here
5/25/2011 | Japan Earthquake Appears to Increase Quake Risk Elsewhere in the Country
Source: Science Daily
Date: May 25, 2011
ScienceDaily (May 25, 2011) — Japan's recent magnitude 9.0 earthquake, which triggered a devastating tsunami, relieved stress along part of the quake fault but also has contributed to the build up of stress in other areas, putting some of the country at risk for up to years of sizeable aftershocks and perhaps new main shocks, scientists say.
...
Read full article here
Date: May 25, 2011
ScienceDaily (May 25, 2011) — Japan's recent magnitude 9.0 earthquake, which triggered a devastating tsunami, relieved stress along part of the quake fault but also has contributed to the build up of stress in other areas, putting some of the country at risk for up to years of sizeable aftershocks and perhaps new main shocks, scientists say.
...
Read full article here
Labels:
aftershocks,
Central Honshu,
Japan earthquake,
Mount Fuji,
Nagano,
Tokyo
5/26/2011 | Marine life soaking up radiation along Fukushima coast
Source: Greenpeace
Date: May 26, 2011 at 15:16
by: Greg McNevin

Two weeks ago we released preliminary results from our marine radiation monitoring work off the coast of Japan, near the melted-down and leaking Fukushima Daiichi nuclear plant. These results showed worrying levels of radioactive contamination in seaweed – a staple of the Japanese diet.
...
Read full article here
Date: May 26, 2011 at 15:16
by: Greg McNevin
Two weeks ago we released preliminary results from our marine radiation monitoring work off the coast of Japan, near the melted-down and leaking Fukushima Daiichi nuclear plant. These results showed worrying levels of radioactive contamination in seaweed – a staple of the Japanese diet.
...
Read full article here
5/26/2011 | New leak feared at stricken Japan nuclear plant
Source: Reuters
Date: Thu May 26, 2011 3:10am EDT
(Reuters) - Radioactive water appears to be leaking from a waste disposal building at Japan's Fukushima nuclear complex, operator Tokyo Electric Power said on Thursday, in a new setback to the battle to contain radiation from the crippled power plant.
...
Read full article here
Date: Thu May 26, 2011 3:10am EDT
(Reuters) - Radioactive water appears to be leaking from a waste disposal building at Japan's Fukushima nuclear complex, operator Tokyo Electric Power said on Thursday, in a new setback to the battle to contain radiation from the crippled power plant.
...
Read full article here
Labels:
Fukushima,
radioactive water,
reactor leaks,
TEPCO
5/26/2011 | Demand for personal Geiger counters soars in Japan
Source: Reuters
Date: Thu May 26, 2011 2:23am EDT
by: Chiaki Kawase
(Reuters Life!) - With a nuclear plant just 240 km (150 miles) north of Tokyo still leaking radiation, demand for personal Geiger counters has skyrocketed in the Japanese capital and manufacturers are struggling to keep up with the demand.
...
Read full article here
Date: Thu May 26, 2011 2:23am EDT
by: Chiaki Kawase
(Reuters Life!) - With a nuclear plant just 240 km (150 miles) north of Tokyo still leaking radiation, demand for personal Geiger counters has skyrocketed in the Japanese capital and manufacturers are struggling to keep up with the demand.
...
Read full article here
5/26/2011 | TEPCO fax about seawater not passed to Kan for hours
Source: Daily Yomiuri Online
Date: May. 26, 2011
by: The Yomiuri Shimbun
Tokyo Electric Power Co. notified the government's nuclear safety agency by fax 3-1/2 hours before it started injecting seawater into the Fukushima No. 1 nuclear power plant's No. 1 reactor, TEPCO said Wednesday.
...
Read full article here
Date: May. 26, 2011
by: The Yomiuri Shimbun
Tokyo Electric Power Co. notified the government's nuclear safety agency by fax 3-1/2 hours before it started injecting seawater into the Fukushima No. 1 nuclear power plant's No. 1 reactor, TEPCO said Wednesday.
...
Read full article here
5/26/2011 | U.S. reactor retrofits in works to avoid blasts
Source: Bloomberg via The Japan Times
Date: Thursday, May 26, 2011
New York/New Delhi — Entergy Corp., the second-biggest nuclear operator in the U.S., and Duke Energy Corp. said the industry may need to retrofit reactors or bolster safety systems after a pressure-relief system failed at the Fukushima No. 1 plant, contributing to the disaster.
...
Read full article here
Date: Thursday, May 26, 2011
New York/New Delhi — Entergy Corp., the second-biggest nuclear operator in the U.S., and Duke Energy Corp. said the industry may need to retrofit reactors or bolster safety systems after a pressure-relief system failed at the Fukushima No. 1 plant, contributing to the disaster.
...
Read full article here
Labels:
Duke Energy,
Entergy,
Fukushima,
hydrogen gas,
reactor 1,
venting
5/26/2011 | One tough job: selling Fukushima
Source: The Japan Times
Date: Thursday, May 26, 2011
FUKUSHIMA — Hands down, the workers at the Fukushima No. 1 nuclear power plant trying to cool off the reactors have one of the toughest jobs in Japan.
But in terms of the burden on one person's shoulders, Masaru Saga, director of the tourism division in the Fukushima Prefectural Government, also ranks high among those in a tight spot.
...
Read full article here
Date: Thursday, May 26, 2011
FUKUSHIMA — Hands down, the workers at the Fukushima No. 1 nuclear power plant trying to cool off the reactors have one of the toughest jobs in Japan.
But in terms of the burden on one person's shoulders, Masaru Saga, director of the tourism division in the Fukushima Prefectural Government, also ranks high among those in a tight spot.
...
Read full article here
Subscribe to:
Posts (Atom)
ShareThis
Radiation News Archive
- ► 2012 (202)


