Tuesday, May 31, 2011

5/31/2011 | Status of nuclear power plants in Fukushima as of 12:00, May 31st (Estimated by JAIF)

Source: JAIF (Japan Atomic Industrial Forum, Inc.)
Date: 5/31/2011 12:00

I have quoted from the latest report various excerpts for recent developments:
...
1. Latest Major event and response
May 29th
09:00-19:00 Water accumulating in the basement of Unit 6 T/B was transferred to a makeshift tank.
09:00-16:00 Operation of removing rubble with remotely controlled heavy machine was conducted
09:00-13:00 Operation of spraying synthetic resin was conducted to prevent scatter of radioactive materials.
11:10-15:35 Water injection into the Unit 1 SFP through the SFP coolant clean up line was conducted.
11:33 Water injection into the No.2 reactor through the feedwater line besides the fire extinguishing line was started.

...
2. Chronology of Nuclear Power Stations
(1) Fukushima Dai-ichi NPS


...
The full report is available below:
ENGNEWS01_1306813176P
Click here for original .pdf file

No comments:

Post a Comment